Sunday, 27 December 2009

The Family Christmas Project has begun

By the end of Sunday ...


It took us two days to clear the site and spread the dirt. I feel absolutely exhausted. The children put in a fantastic effort. The heat really took a lot out of us all, but here's the result of our labour.

There were 320 wheelbarrows of dirt to be shifted (16 barrows per cubic metres. Therefore 10 cubic metres per truck load. Two truckloads equals 320 wheelbarrows.)

Phase One: Complete



Thanks for dropping by
ka kite ano

No comments:

Post a Comment